U Type Subway Slag Handling Gantry Crane

U Type Subway Slag Handling Gantry Crane is designed for subway and metro construction sites to lift, transfer, and overturn slag buckets, pipe sheets, and construction materials.

  •   Suitable for subway and metro construction slag handling operations
  •   Used for slag bucket lifting, turning, dumping, pipe sheet handling, and construction material transfer
  •   Hydraulic overturning trolley can be selected according to slag discharge direction
  •   Variable span or special travelling arrangement can be considered for frequently changing construction sections
  •   Rail clamp, anchoring, limit, overload, and emergency stop protection should be confirmed for outdoor site safety
  •   Final selection should confirm slag bucket size, discharge position, rail layout, lifting height, control method, and site power supply

Description

U Type Subway Slag Handling Gantry Crane is a special gantry crane designed for subway and metro construction sites. It is mainly used for lifting slag buckets, overturning excavated material, transferring pipe sheets, and handling construction materials during underground railway and tunnel construction.

The crane adopts a U-type gantry structure with main hoisting system, trolley travelling mechanism, cart travelling mechanism, hydraulic overturning mechanism, driver’s cabin, electrical system, and safety protection devices. The open U-type frame provides practical clearance for slag bucket lifting and material transfer, making it suitable for construction sites where working space, lifting direction, and discharge position need to be coordinated carefully.

For slag dumping operation, the trolley can be equipped with a hydraulic turning mechanism and slag-turning hook. The hanging beam lifts the slag bucket first, then the hydraulic system controls the turning hook to guide the bucket to the required position and complete the dumping process. This design helps improve slag handling efficiency and supports continuous construction in subway and metro projects.

The crane can be configured with windproof rail clamps, limit switches, buffers, rail sweepers, emergency power-off protection, overload protection, platforms, ladders, and driver’s cabin according to project requirements. For sites where the construction section changes frequently, span arrangement, power supply method, and travelling mechanism can be customized to match the site layout and construction process.

For related lifting equipment, you can also view Gantry Cranes, Overhead Cranes, and Electric Hoists. For construction crane safety reference, you may check the OSHA Cranes and Derricks in Construction Standard.

Parameter

ParameterMain LiftingTrolley TravelCart Travel
Lifting Weight75t
Lifting Speed (m/min)1 / 10
Working LevelM6M6M6
Maximum Lifting Height (m)Up 10 / Down 16.5
Gauge (mm)900030000
Running Speed (m/min)2 / 203 / 30
Base Distance (mm)356011740
Power Supply50Hz 380V
Wire Rope Structure6W(19)-30-170
Wire Rope Count2 × 6
Working Pull (kN)72.5
Reel Diameter (mm)Φ800
Buffer Stroke (mm)100140
Rail ModelP4350kg/m
Wheel Diameter (mm)Φ600Φ600 × 16
Maximum Wheel Pressure (kN)285248
Electric Motor ModelYZP400L1-10YZP160M1-6YZP160L-6
Electric Motor Power (kW)1602 × 5.54 × 11
Electric Motor Speed (r/min)585970945
Reducer ModelZQA1000-i-3CZSCA600-i-5/6ZSCA600-i-1/2
Reducer Speed Ratio2577.559
Brake ModelYWZ4-500/E201YWZ-200/25YWZ4-200/T40
Braking Torque (N·m)2 × 36002 × 2004 × 270
Limit SwitchDXZLX10-11

Features

Special U-type gantry structure for subway and metro construction slag handling Designed for lifting slag buckets, pipe sheets, and construction materials Hydraulic overturning mechanism available for slag bucket dumping operation Hanging beam and freely rotatable hook used for lifting and transferring materials Windproof rail clamp helps prevent crane sliding when the crane is stopped Main hoisting, trolley travelling, and cart travelling mechanisms support continuous construction handling Driver’s cabin, electrical system, platforms, ladders, and safety devices available according to site requirements Customized span, power supply, and travelling arrangement for changing subway construction sites Suitable for subway construction, metro construction, tunnel works, and underground engineering projects

Customized

U Type Subway Slag Handling Gantry Crane can be customized according to subway construction process, slag bucket size, lifting point arrangement, discharge direction, site span, rail layout, and power supply condition.

Available customization includes U-type gantry structure, A-type or U-type outrigger arrangement, main hoisting system, hydraulic overturning trolley, hanging beam, slag-turning hook, trolley travelling mechanism, cart travelling mechanism, driver’s cabin, safety protection system, platforms, ladders, rail clamps, and electrical control system.

  • Customized lifting capacity and lifting height
  • Customized span and rail layout according to site condition
  • Customized hydraulic overturning mechanism for slag bucket dumping
  • Customized hanging beam, hook, or spreader according to handled material
  • Customized trolley and cart travelling speed configuration
  • Customized windproof rail clamp, limit switch, buffer, and safety protection
  • Customized power supply method for subway and metro construction sites

Before quotation, please confirm the slag bucket size, material weight, lifting height, span, rail gauge, rail length, discharge direction, working frequency, site power supply, and whether variable span or steering dumping trolley is required.

Get in Touch

Contact Us

Scroll to Top